How long does it take to make and install a sign?

From the point of conception to installation, time can vary depending on permitting. Most electric signs have a 4-6 week lead time, but due to most of our work being completed in house, production time can shorten depending on how complicated the signage it is. Smaller signs that do not require permitting can be delivered much more quickly.